European Commission, DG JRC - Joint Research Centre
Encore 10 jours pour répondre
stratégie (description, +15)
data (description, +15)
Un signal dans l'intitulé vaut 40 points, une mention dans la description 15, jusqu'à 100. Le score d'un poste ne dit rien des autres : cet avis n'a pas de note générale.
The contractor will have to develop methods for carbon and environmental footprint accounting of critical raw materials (CRMs) present in strategic EU sectors. The contractor should: review analysis and accounting methods already developed by JRC (in relationship with the EF Recommendation 2279/2021, the Critical Raw Materials Act (EU) 2024/1252 EU, and the Batteries Regulation (EU) 2023/1542); collect relevant data on impacts of raw materials and components; and to develop concrete footprint models of CRM as present in batteries for different products (as electric vehicles and industrial batteries). The contractor will have to collect relevant data and references to support potential carbon and environmental footprint measures for EU product policies. This contract is needed because this work requires sectorial data and specific modelling capacity that are not available in-house. The results will provide an independent evidence base to support the development and implementation of JRC projects. Climate change posting criteria: 1 (40%)
Le dossier de consultation et les modalités de réponse sont sur l'avis officiel. Calloffre ne soumet jamais de réponse à votre place — l'outil vous aide à repérer les appels d'offres qui correspondent à votre métier et à préparer un premier brouillon de mémoire technique, que vous relisez et envoyez vous-même.
LIBYE · Département LY
Données issues du BOAMP (DILA), publiées sous Licence Ouverte / Etalab 2.0. L'avis officiel fait foi : Calloffre reproduit les informations de la notice mais ne garantit ni leur exhaustivité ni leur actualité.